
172 Chapter 6
BERT Testing
Measuring RF Loopback BER with Option 300
Figure 6-6
Once synchronization is achieved, the ESG will expect to receive a TCH to decode and,
accordingly, will display the Waiting for TCH message. Refer to Figure 6-7.
Figure 6-7
5. Turn off the BCH signal. and set up the base station to send the TCH signal
6. Set up the base station and start sending the TCH signal now. The TCH is only required to
contain a valid midamble.
Kommentare zu diesen Handbüchern