
152 1100 Series Capillary LC System Manual
6Options
7 Fix the Z-panel with the two screws. 8 Reconnect the grounding connection of the valve at
the Z-panel.
9 Replace the foam section, the top cover and front cover.
10 Replace the column compartment into stack.
11 Reconnect capillaries.
12 Reconnect the power cable.
13 Turn on the column compartment.
Kommentare zu diesen Handbüchern