Agilent-technologies E8247C PSG CW Bedienungsanleitung Seite 75

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 220
  • Inhaltsverzeichnis
  • FEHLERBEHEBUNG
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 74
Chapter 3 65
Optimizing Performance
Creating and Applying User Flatness Correction
Configure the Power Meter
1. Select SCPI as the remote language for the power meter.
2. Zero and calibrate the power sensor to the power meter.
3. Enter the appropriate power sensor calibration factors into the power meter as appropriate.
4. Enable the power meter’s cal factor array.
NOTE For operating information on a particular power meter/sensor, refer to its operating guide.
Connect the Equipment
Connect the equipment as shown in Figure 3-4.
NOTE During the process of creating the user flatness correction array, the power meter is slaved
to the signal generator via GPIB. No other controllers are allowed on the GPIB interface.
Figure 3-4 User Flatness Correction Equipment Setup
Seitenansicht 74
1 2 ... 70 71 72 73 74 75 76 77 78 79 80 ... 219 220

Kommentare zu diesen Handbüchern

Keine Kommentare